Day 5 - Yorkshire Moors
Paul looks back on a washed out bridge for a photo. Some of the washouts had been replaced with portable bridges brought in the by the Army. The main group of walkers going up hill are at the high water level of the flood waters. The plant leaves there were still covered with heavy silt from the flood.
Day 0 Arriving
Day 1 Lake District
day 2
day 3
day 4
day 5
drizzle
flood damage
rain gear
stream
path closed
high ground
bridge out
railroad farm
flooded ford
scythe
lunch
walking stick
rievaulx
helmsley
helmsely
day 6
day 7
the walk
the walkers
the wayfarers
homepage